Busan

Busan opens metro Line 1 extension and adds new trains

Today Busan Transport Corporation opened a new extension on the city’s metro Line 1. The new section connects the previous south-western terminus at Sinpyeong with Dadaepo Beach.

At 7.98km long, there are six new stations on the extension, Dongmae, Jangnim, Sinjangnim, Natgae, Dadaepo Harbor and Dadeapo Beach. Construction on the 959 billion won project began in late 2009 and was completed in December last year.

The new section of track brings Line 1’s length from 32.5km to 40.48km, and provides an easier route into Busan’s southern industrial area, as well as a better connection to the beach.

Six brand new train sets (48 cars in total) will operate on the line, which feature more spacious seating, improved safety features and LTE-R mobile connections, a world first for urban rail. Busan Transport Corporation also signed a contract with Hyundai Rotem last year for 40 more new cars to replace the current rolling stock which dates back to 1985 and 1986. This new fleet will be delivered between the end of 2017, up until June 2018.

A future extension is also being planned for the eastern end of Line 1, but this is not expected to open until 2021. More about this in a future post.

Andy

Originally from New Zealand, Andy moved to Korea in 2007 and very quickly became interested in the many different public transport and urban development projects around Korea. He currently works in the transport sector in a communications role.

Recent Posts

GTX-A is finally here

The first segment of the Great Train eXpress (GTX) officially opened on March 30, 2024…

3 months ago

Go on a virtual train ride

See what it's like to ride the KTX and other trains across Korea from the…

1 year ago

A conversation with ChatGPT about Seoul’s public transport system and more

ChatGPT does not need an introduction. The evolution in AI and the leaps the Internet…

2 years ago

Climate action on transport by Korea

14% of Korea's greenhouse gas emissions are caused by transport as of 2017, making it…

2 years ago

Tunnelling of first GTX-A section complete

Another milestone for the GTX project was announced just before the new year — one…

2 years ago

Line 9 extension gets green light — again

Wanna feel old? Seoul's Line 9 is nearly 13 years old! But it is still…

2 years ago